The drilling and workover capacity is 5,000m (16,400 ft) and 9,000m
(30,000 ft) respectively. And it is applicable for drilling in waters up
to 91.44m (300 ft) deep under designed environmental condition.
Features
CP-300W
jack-up workover platform
is self-propelled
with DP-1 dynamic positioning system for offshore workover operation,
sidetracking drilling, oil & gas field recovering and E&P
operations. The drilling and workover capacity is 5,000m (16,400 ft) and
9,000m (30,000 ft) respectively. And it is applicable for drilling in
waters up to 91.44m (300 ft) deep under designed environmental
condition.
Equipped with 30,000 ft full automatic
hydraulic workover module and automatic control system, the platform
meets the requirements of exploration and development in the sea area
within 300 ft water depth as well as ship owners and inspection
organizations. The design life is 20 years. With core technology and
independent intellectual property in platform designing and building, We
have strong advantages to provide customers with reliable and
competitive products.
Specifications
Product
|
CP- 300 W Jack-up Workover Platform
|
Classification
|
ABS/CCS
|
Accommodation
|
100 Persons
|
Operating Water Depth
|
300 ft
|
Design Ambient Temperature
|
0 ℃ ~ 50 ℃
|
Workover Depth
|
9,000 m ( 30,000 ft )
|
Drilling Depth
|
5,000 m ( 16,400 ft )
|
Molded Length
|
67.11 m ( 220 ft )
|
Molded Width
|
55.78 m ( 183 ft )
|
Molded Depth
|
7.62 m ( 25 ft )
|
Longitudinal Leg Spacing
|
35.055 m ( 115 ft )
|
Transverse Leg Spacing
|
36.6 m ( 120 ft )
|
Leg Length Overall
|
135.6 m ( 444.9 ft )
|
Spud Can Diameter
|
13.8 m ( 45.3 ft )
|
Towing Maximum Variable Load
|
2,000 t
|
Storm Survival Variable Load
|
2,000 t
|
Operational Variable Load
|
3,500 t
|
Cantilever Maximum Longitudinal Reach
|
21.3 m ( 70 ft )
|
Drill floor Maximum Transverse Movement Of Centre Line
|
± 4.57 m (± 15 ft )
|
Storage Capacity
|
Fuel Oil
|
451 m³ (15,927 cu ft)
|
Potable Water
|
434 m³ (15,327 cu ft)
|
Drilling Water
|
1,420 m³ (50,147 cu ft)
|
Preload Water
|
~ 6,200 t
|
Liquid Mud/ Liquid Washing
|
350 m³ (12,360 cu ft)
|
Hot Seawater
|
269 m³ (9,500 cu ft)
|
Well Dirty Liquid
|
210 m³ (7,416 cu ft)
|
Base oil
|
107 m³ (3,779 cu ft)
|
Brine
|
107 m³ (3,779 cu ft)
|
Bentonite / Barite
|
70 m³ (2,472 cu ft)
|
Cement
|
140 m³ (4,944 cu ft)
|
Sack Storage
|
2,000 sacks
|
Using a unique tool to convey intervention tools into horizontal and deviated wells. Provides pressure pumping, cementing, stimulation and coiled tubing services worldwide, tubular, process, pipeline and specialty chemical services in selected areas. Includes a reference library, a catalog of products and services. Provides oil and gas exploration companies with acidizing, hydraulic fracturing, coiled tubing, nitrogen and CO2 drilling and completion services. Based in Alberta, Canada.
Offers well servicing with a fleet of double drum work over rigs and swabbing units. Based in Canadian, Texas. Supplier of machinery and materials including drilling and workover rigs and ancillary equipment and parts. Operating 242 rigs, mainly in Canada. Most of these are workover rigs.
Tour the completely refurbished jackup drilling rig, absorb the day-to-day excitement of offshore drilling and production, marine transportation, environmental protection, construction, and pipelining. Located in Galveston. Tour the completely refurbished jackup drilling rig, absorb the day-to-day excitement of offshore drilling and production, marine transportation, environmental protection, construction, and pipelining. Located in Galveston. Operating approximately 50 offshore drilling rigs worldwide.