Product List

2000 Fracturing Unit

• 180mm super-wide anti-collision cross beams made of aluminum alloy are designed to ensure safety.
• Control Box
Shock pad on the bottom of the box ensures the stability during operation.
Automatic constant-temperature control ensures the normal operation in arctic and high-temperature areas.
• Considering oil safety, Petrokh optimizes the fuel system to avoid engine damages caused by unclean oil, which extends the service life of the engine.

Features

• 180mm super-wide anti-collision cross beams made of aluminum alloy are designed to ensure safety.
• Control Box
Shock pad on the bottom of the box ensures the stability during operation.
Automatic constant-temperature control ensures the normal operation in arctic and high-temperature areas.
• Considering oil safety, Petrokh optimizes the fuel system to avoid engine damages caused by unclean oil, which extends the service life of the engine.
• Double starting system with one in use and the other in standby to prevent accidents in starting.
• Communication data cable: user-friendly layout and proper height design bring more convenience and comfort.
• External air outlet getting air from chassis air bottle and provide it for external pneumatic components.
• Tilting tail lamp guard improves the efficiency of repairing tail lamps.
• Streamlined water supply manifold reduces resistance and power loss.
• Purging device: apply pneumatic purging system to purge the residual liquid in low pressure manifolds.
• Concealed pull-out self-limiting ladder: plunger pump maintenance platform is one of the most frequently used components, of which operating convenience and utility directly influences maintenance technician’s working efficiency.
• The drive shaft is guarded completely to ensure safety.
• 1560L fuel tank guarantees working hours.
• High level indicators warn to indicate abnormal parameters of the engine, transmission and plunger pump to help the operator solve the problems quickly.
• Integral high-quality bent coolant pipes reduce the possibilities of leaking welding points.
• Petrokh fracturing unit control: throttle soft control, step-by-step shifting to reduce impact, in-time overpressure protection, fracturing unit type self identification, remote centralized control, control of multiple units with one screen, flexible control with random grouping, one key to idle speed and neutral gear; real-time pressure curve display, first gear pressure testing function; one key to shift between multiple units; tracking of multiple warning information.

Specifications

Overall Dimensions (L×W×H) 11,300×2,500×4,000 mm
Weight 38,000 kg
Max. Theoretical Displacement of Plunger Pump 2.46 m3/min
Max. Discharge Pressure 103.4 MPa (15000 psi)
Max. Output Power of Plunger Pump 1,490 kW

Hydraulic Frac Units

  • Engineering portal for geoengineers interested in hydraulic fracturing in site stress measurements.
  • National anti-hunger organization that lobbies on behalf of Food Stamps, the Women Infants and Children (WIC) program, and other federal food and nutrition programs.
  • Hydraulic engineering consultants offering hydraulic designs, hydraulic testing, fabrication, maintenance and repairs.
  • frac pump equipment

  • Provides mortar pumps, material pumps, conveyors, a complete line of equipment and accessories.
  • Commercial gear pump and screw pump specialist, also supplying centrifugal pumps, filtration equipment and flow meters. Pump packages designed and manufactured to order.
  • Supply and installation of waterwell pumps, water treatment equipment, pool and spa pumps and supplies. Repairs to all pumps, engineered sewage, water, pool, spa, water treatment equipment.
  • Fracturing Pump Units

  • Fractures of the wrist by Orthopaedic Surgeon Mr G J Packer details the causes and treatments of wrist fractures.
  • Suppliers of submersible pumps, swimming pool pumps, pond pumps, hand pumps, drainage pumps, garden and ornamental pumps.
  • Offering complex orthopaedic procedures including limb lengthening, calcaneus fractures, limb salvage, bone infection, osteomyelitis, joint replacement and additional services.
  • 2000 Fracturing Unit