Features
1. The fracturing trailer is configured with triplex or quintuple pump, advanced digital controlling system and optional analog controller.Hydraulic Fracturing Process
It starts with a good bit of water and a lot of sand. Mix the water and sand together, then, apply thousand pounds of pressure and introduce them into a reservoir several thousand feet underground. Generally, a small percentage of additives are added to aid in delivering that solution down the hatch. Then, the force of water creates a network of tiny fissures in the impermeable rock. The flow water acts as a delivery mechanism for the sand, which finds its way into those newly created cracks and holds them open. This creates passageways through which the previously trapped natural can get to the wellbore. Finally, the fracturing process is finished; on average, it takes 3 to 10 days to complete. Now it's time for the operator to remove the water, clearing the way for the newly stimulated well to produce energy for the next 20, 30, 40, even 50 years.Tag: Skid Mounted Cementing Units | Oil Field Service Equipment | Skid Mounted Well Cementing Skid | oilfield cementing equipment
Tag: acid chemical pump | corrosion resistance large acid water chemical pumps | Acid Proof Sinking Pump | Centrifugal acid chemical pumps